Tuesday, 29 March 2011
Monday, 14 March 2011
Disaster ...
When filing the points and checking the level, I moved one of the points and it has failed, so I will have replace it. Luckily I have a spare left-handed point and I have started on removing the failed point, but it will be a tricky process ...
NGN
Picked up a few items at NGN in Leeds on Sunday.
Including; Festiniog Adventure by Nick Welch
I will try to review as soon as poss
Including; Festiniog Adventure by Nick Welch
I will try to review as soon as poss
NGN
Picked up a few items at NGN in Leeds on Sunday.
Including; Festiniog Adventure by Nick Welch
I will try to review as soon as poss
Including; Festiniog Adventure by Nick Welch
I will try to review as soon as poss
Boiler House
The Work on the Boiler House is almost complete. I have taken some pictures and will try to post asap. Whilst waiting for the glue to dry I started filing the excess solder on the points ...
Wednesday, 23 February 2011
Update
Over the winter, the fiddle yard has been almost completely re-wired.
The main power supply has now been split into two supplies with great sucess - the track is now separate to the ancilaries.
I have broken into the boiler house, and a boiler and "effect" are being installed.
Some grass has arrived, some gorse is on order.
Some switches have arrived so I can now start on wiring up the main point blades.
Station lights have been removed and N gauge ones installed, but power (14-16v AC or DC) is an issue, so "new" 12v DC bulbs are on order.
I bought some draw sliders from B&Q and may consider using them on the fiddle yard ala Loch Ewe Harbour.
The "old" roco has had it's wheels changed to new ones and tested. Driver & name plates to be fitted.
G. Thommen now has a fireman, the driver needs to be painted and installed.
VoR Guards van that got damged in transit has been repaired and now needs tested.
The main power supply has now been split into two supplies with great sucess - the track is now separate to the ancilaries.
I have broken into the boiler house, and a boiler and "effect" are being installed.
Some grass has arrived, some gorse is on order.
Some switches have arrived so I can now start on wiring up the main point blades.
Station lights have been removed and N gauge ones installed, but power (14-16v AC or DC) is an issue, so "new" 12v DC bulbs are on order.
I bought some draw sliders from B&Q and may consider using them on the fiddle yard ala Loch Ewe Harbour.
The "old" roco has had it's wheels changed to new ones and tested. Driver & name plates to be fitted.
G. Thommen now has a fireman, the driver needs to be painted and installed.
VoR Guards van that got damged in transit has been repaired and now needs tested.
Subscribe to:
Posts (Atom)