Tuesday 29 March 2011

Monday 14 March 2011

Disaster ...

When filing the points and checking the level, I moved one of the points and it has failed, so I will have replace it. Luckily I have a spare left-handed point and I have started on removing the failed point, but it will be a tricky process ...

NGN

Picked up a few items at NGN in Leeds on Sunday.
Including; Festiniog Adventure by Nick Welch
I will try to review as soon as poss

NGN

Picked up a few items at NGN in Leeds on Sunday.
Including; Festiniog Adventure by Nick Welch
I will try to review as soon as poss

Boiler House

The Work on the Boiler House is almost complete. I have taken some pictures and will try to post asap. Whilst waiting for the glue to dry I started filing the excess solder on the points ...

Wednesday 23 February 2011

Update

Over the winter, the fiddle yard has been almost completely re-wired.

The main power supply has now been split into two supplies with great sucess - the track is now separate to the ancilaries.

I have broken into the boiler house, and a boiler and "effect" are being installed.

Some grass has arrived, some gorse is on order.
Some switches have arrived so I can now start on wiring up the main point blades.

Station lights have been removed and N gauge ones installed, but power (14-16v AC or DC) is an issue, so "new" 12v DC bulbs are on order.

I bought some draw sliders from B&Q and may consider using them on the fiddle yard ala Loch Ewe Harbour.

The "old" roco has had it's wheels changed to new ones and tested. Driver & name plates to be fitted.

G. Thommen now has a fireman, the driver needs to be painted and installed.

VoR Guards van that got damged in transit has been repaired and now needs tested.